ARMY
TM 5-6115-612-34
MARINE CORPS TM 6115-34/8
AIR FORCE
TO 35C2-3-471-2
NAVY
AG-320BO-MME-OOO
3-12. CHASSIS FRAME ASSEMBLY. (cont)
a.
Removal. (cont)
(12) Loosen
turnlock
fasteners
and remove plenum access cover.
(13) Support discharge end of
exhaust
nozzle.
Remove
self-locking
nuts,
washers,
capscrews,
and
four-section nozzle gasket retainer.
Pull nozzle into engine housing and
remove.
(14) Remove oil cooler (paragraph
7-3a) and oil cooler supply and return
lines.
(15) Remove
engine
fuel
tank
(paragraph 4-39a, TM 5-6115-612-12).
(16) Remove
brake
control
installation
(paragraph
4-90c,
TM 5-6115-612-12).
(17) Ensure that all fuel/lubri-
cation lines and electrical wiring that
go through,
or are secured to,
the
floor panel are tagged, disconnected,
and secured within the upper housings
or completely removed from the gen-
erator set.
(18) Refer to paragraph 2-4a for
procedure to remove lockbolts.
Remove
all lockbolts that secure housings to
floor panel and chassis frame.
(19) Lift
housings
off
floor
panel.
(20) Remove
lockbolts
(figure
3-3).
Lift floor panel off chassis
frame.
(21) Remove
torsion
axle
(paragraph 12-2a).
(22) Remove tiedown rings (para-
graph 4-14a, TM 5-6115-612-12).
(23) Remove nut (1, figure 3-4),
washer (2), terminal lug (3) of ground
cable, washer (2) and nut (4) to remove
ground stud (5) from chassis frame (6).
b. Repair.
(1) Held cracks and holes.
(2) Remove dents and straighten
bent sections.
(3) Remove corrosion and chipped
paint.
Prime and repaint.
(4) Measure and fabricate new
parts.
c.
Installation.
(1) Install
ground
stud (5,
figure 3-4) and secure with nut (4).
Torque to 74-82 inch pounds (8.4-9.3
Nm).
Install washer (2) and terminal
lug (3).
Secure with washers (2) and
nut (1).
Torque
to 74-82 pounds
(8.4-9.3 Nm).
(2) Install
tiedown
rings
(paragraph 4-14b, TM 5-6115-612-12).
(3) Install
torsion
axle
(paragraph 12-2b).
(4) Place floor panel in position
and
secure
with lockbolts at each
corner.
(5) Place housings in position on
floor panel.
(6) Refer to paragraph 2-4b for
procedure to install lockbolts. Secure
housings and floor panel to chassis.
(7) Ensure
that
all
fuel/
lubrication lines and electrical wiring
are routed to correct locations and
securely fastened where required.
3-16