TM 55-2840-254-23
1-81 CHECK ENGINE COASTDOWN TIME
Personnel Required:
INITIAL SETUP
Applicable Configurations:
All
References:
TM 55-1520-240-10
Tools:
Task
8-28
Powerplant Mechanic's Tool Kit,
Task
8-35
Task
8-88
Technical Inspection Tool Kit,
Task 8-23
Task
8-90
Task 8-27
Task
8-94
Stop Watch
Materials:
None
1. Operate engine long enough to ensure that all
engine parts have reached normal operating
temperatures (Ref. TM 55-1520-240-10 or
2. Move engine power lever (N1) to GRD IDLE
Run engine for a minimum of 2 minutes to
stabilize engine rpm and temperature.
NOTE
Coastdown time normally exceeds&
seconds.
3. Shut down engine (Ref. TM 55-1520-240-10 or
coastdown.
4. If coastdown time is less than 25 seconds, pro-
ceed as follows:
GO TO NEXT PAGE