TM 55-2840-254-23
1-25
1-25 INSPECT PRESSURIZED SHIPPING AND STORAGE CONTAINER (Continued)
23. Install cover assembly (14) on base assembly
24. Remove humidity indicator (19) and packing
(20).
25. Remove bushing (21) and humidity indicator
card (22).
26. Install new humidity indicator card (22) and
bushing (21) in housing (23).
27. Install packing (20) and humidity indicator
(19) in base assembly (12).
GO TO NEXT PAGE