TM 55-2840-254-23
1-25
1-25 INSPECT PRESSURIZED SHIPPING AND STORAGE CONTAINER (Continued)
34. Install bonding seal (E9) (29) through hole
(32) on aft end of shipping container.
35. Check humidity indicator (1). If 40 and 50
percent segments are not blue proceed as
follows:
GO TO NEXT PAGE
1-58