TM 55-2840-254-23
1-25
1-25 INSPECT PRESSURIZED SHIPPING AND STORAGE CONTAINER (Continued)
30. Remove historical records (27) from record
receptacle (28). Record date of repressuriza-
tion and name of activity on historical record
(27) (Ref. TM 38-750).
31. Install complete historical records (27) in
record receptacle (28). Close cover (26) and
tighten two wing nuts (25).
GO TO NEXT PAGE
1-56