TM 55-2840-254-23
1-25
1-25 INSPECT PRESSURIZED SHIPPING AND STORAGE CONTAINER (Continued)
20. Wipe sealing gasket (10) clean using lint-free
cloth (E26).
21. Apply light coat of glycerol (E21) on sealing
gasket (10). Install sealing gasket (10) in
groove (15) of base assembly (12).
NOTE
Step 22. shalI be performed immediately
base assembly.
22. Install five bags of desiccant (16) (E 16) in
desiccant basket (17).
GO TO NEXT PAGE
1-53