TM 55-2835-209-23
5-13 INSTALL APU WIRING HARNESS ASSEMBLY (CONT)
15.
16.
17.
18.
Remove nuts (20, 21), nut (22, de-
leted) from immersion thermocouple
connections and install marked
leads (19).
Install nuts (20, 21)
on studs.
Torque nuts to 38 to 42
inch-pounds.
Install ground wire
on upper side of immersion thermo-
couple and secure using bolt (21.1)
and nut (21.2).
Torque bolt to 38
to 42 inch-pounds.
Install clamp (23) to bracket on
fuel manifold assembly. Secure
with bolt (24) and nut (25).
Torque to 25 to 29 inch-pounds.
Install clamps (26, 27) to bracket
on secondary fuel nozzle assembly.
Secure with bolt (28) and nut (29).
Torque to 25 to 29 inch-pounds.
Install clamp (30) to bracket on
top primary fuel nozzle assembly.
Secure with bolt (31) and nut (32).
Torque to 25 to 29 inch-pounds.
FOLLOW-ON MAINTENANCE: None.
5-28
Change 1