TM 55-2835-208-23
2-70 INSTALL BASE ASSEMBLY (Continued)
2-70
4.
5.
6.
7.
8.
9.
10.
11.
NOTE
Perform steps 4, 6, and 7 without
installation of tubing or fuel inlet
filter for ease of access.
Install solenoid valves (Task 2-68).
Install tube assembly (9) and torque B-
nut (10) to 80 inch-pounds.
Install solenoid valve (Task 2-66).
Install fuel control (Task 2-57).
Install tube assembly (11) and torque B-
nut (12) to 80 inch-pounds.
Install tube assemblies (14, 15, 16, 17).
Torque B-nuts (18, 20) to 100 inch-
pounds, B-nuts (19) to 80 inch-pounds
and B-nuts (21) to 135-150 inch-
pounds. Torque fuel connnection bolts
(13) to 45 inch-pounds.
Install fuel inlet filter (Task 2-61).
Install fuel control cover (Task 2-48).
INSPECT
FOLLOW-ON MAINTENANCE:
Leak Check During Operation
END OF TASK
Change 4
2-135