TM 5-6115-590-12
Heat exchanger heating....................
inflation ejector .......................................... 200 scfm (min)
capacity.............................................60,000 btu/hr at
(9) Vacuum system
sea level and
Vacuum source......................................... Compressed air
ambient
through eductor
temperature
Suction by eductor....................................10 scfm at 18 to
-65°F (-54°C)
20 in. Hg A
Hot water storage tank
(10) Engine fuel and bleed-air systems schematic.
capacity.............................................15 gal (approx)
Refer to figure 1-4.
Hot water temperature.......................140° to 160 F
(11) Engine electrical system schematic.
(60° to 72° C)
Refer to figure 1-5.
Temperature-pressure
(12) Engine lubrication system schematic.
relief valve setting..............................200 °F (93° C), 75
Refer to figure 1-6.
psig
(13) Power plant electrical system schematic.
High pressure relief
Refer to FO-1 located in back of manual.
valve setting ......................................100 psig
(14) Cooled air system schematic.
Hot water pressure switch
Refer to figure 1-9.
actuation:
(15) Heated air system schematic.
Close on use to.................................10 psig
Refer to figure 1-10.
Open on decrease at.........................5 psig
(16) Water system schematic. Refer to figure 1-12.
(8)
Compressed air system
(17) Instrument panel wiring diagram.
Normal external
Refer to figure FO-2 located in back of manual.
discharge pressure...........................55 to 110 in. Hg
(18) Engine and skid assembly wiring diagram.
A
Refer to figure FO-3 located in back of manual.
Pressure through
(19) Conditioned air system wiring diagram.
Inflation ejector..................................1.5 psig (min)
Refer to Figure FO-4 located in back of manual.
Flow through
Change 6
1-33(1-34 blank)