TM 55-2835-209-23
Section X INSTALL POWER SECTION ASSEMBLY
7-10 INSTALL POWER SECTION ASSEMBLY (AVIM)
INITIAL SETUP
Tools:
Aircraft Inspection Tool Kit (T49)
Engine Repairmans Tool Kit (T47)
Torque Wrench 30-150 inch-pounds
Personnel Required:
68B Aircraft Powerplant Inspector
68B Aircraft Powerplant Repairer
Assistant
Materials/Parts:
Antiseize Compound (D8)
Bolt
Lockwire (D43)
Lubricating Oil (D16)
Nut
Packing
Stud
Washer
Equipment Conditions:
APU Gearbox on Maintenance Stand (T1)
General Safety Instructions:
Engine fuel is toxic and flam-
mable.
To prevent personnel
injury, avoid contact with
eyes and repeated or prolonged
contact with skin.
Lubricating oils, DOD-L-85734,
MIL-L-23699 and MIL-L-7808,
contain material hazardous to
health.
They produce paraly-
sis if swallowed or from pro-
longed skin contact. They may
burn if exposed to heat or
flames.
Wash hands thoroughly
after handling.
Use only with
proper ventilation.
7-20
Change 1