TM 55-2835-209-23
5-8 INSTALL METER BRACKET (CONT)
1.
2.
3.
4.
5.
6.
7.
NOTE
Prior to assembly, components
will be visually inspected for
damage.
Apply antiseize compound (D8) to
bracket mount bolts (3).
Position meter bracket (1) and se-
cure in place with washers (2) and
bolts (3).
Torque bolts (3) to 38 to 42 inch-
pounds.
Secure fuel solenoid valve to fuel
manifold assembly tube clamp to
meter bracket with bolt (8). Torque
bolt to 38 to 42 inch-pounds.
Install electrical connector (4)
from inbound side.
Secure using
washers (5), screws (6) and nuts
(7).
Torque nut (7) to 6 to 8 inch-
pounds.
Install hourmeter (Task 5-4).
FOLLOW-ON MAINTENANCE: None.
5-18