TM 55-2835-208-23
2-82 INSTALL ENGINE ELECTRICAL HARNESS ASSEMBLY
2-82
INITIAL SETUP
Applicable Configurations:
All
Tools:
Engine Repairmans Tool Kit
NSN 5180-00-323-4944
Materials:
Lockwire (E32)
Anti-Seize Compound (E15)
Fiberglass tape (E34)
Personnel Required:
68B Aircraft Powerplant Repairer
68B Powerplant Inspector
Equipment Condition:
APU in Assembly Fixture (Task 1-22)
1.
2.
2.1
3.
4.
4.1
Secure connector J301 (27) to
bracket (41) with screws (25)
and washers (26).
Install
terminal board (43)
using screws (44), washers (45)
and nuts (46).
On
APU PN 116305-300, wrap
wiring
harness at
mount
positions of clamps (38) with
fiberglass tape (E34) to ensure
proper clamp fit.
Position clamps (31), (38) on
harness assembly.
Secure clamps (34) and (35)
with bolts (32) and washers
(33).
On APU PN 116305-300, secure
bracket (41) with two leftmost
screws
(44) and washers (45).
Secure meter assembly (45.1)
with remaining screws (44) and
washers (45).
Secure ground
wire using bolt and washer.
GO TO NEXT PAGE
2-152
Change 2
