TM 1-2840-252-23-2
6-32
INITIAL SETUP
Materials:
None
Applicable Configurations:
Personnel Required:
All
Aircraft Powerplant Repairer
Tools:
Equipment Condition:
Off Engine Task
Technical Inspection Tool Kit,
1. Straighten bends or distortion in area of bolt holes
(1) in bracket (2).
NOTE
This repair is allowed as long as it does not generate
cracks beyond the following limits:
a. There shall be no more than one edge-to-bolt hole
crack (3) per each bolt hole (1).
b. At bolt holes with edge-to-bolt hole crack (3), there
shall be no more than one additional crack (4) Crack
(4) shall be no more than 1/16 inch long.
c. There shall be no converging cracks (5) that might
cause material to fall out.
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK