TM 1-2840-252-23-2
INSPECT THIRD TURBINE NOZZLE AND
SUPPORT (AVIM)
4-29
INITIAL SETUP
Materials:
None
Applicable Configurations:
All
Personnel Required:
Tools:
Technical Inspection Tool Kit,
Equipment Condition:
Off Engine Task
1. Inspect forward side of third turbine nozzle (1) as
follows:
Inspect outer shroud (2). There shall be no
a
cracks (3) from vane leading edge (4) longer than
1/8 inch.
b
There shall be no cracks longer than 1/4 inch in
boss brazed joint (5). There shall be no more than
five bosses with cracks less than 1/4 inch long in
brazed joint (5).
GO TO NEXT PAGE