TM 1-2840-252-23-2
4-29
INSPECT THIRD TURBINE NOZZLE AND SUPPORT (AVIM) (Continued)
4-29
Inspect inner shroud (16). There shall be no
e
more than one crack (17) from each vane leading
edge slot (18) to braze line (19).
Inspect forward support (20). There shall be no
f
cracks.
Inspect 16 rivets (21). There shall not be more
g
than 40 percent missing material (22).
GO TO NEXT PAGE
4-116