TM 1-2840-252-23-2
ASSEMBLE COMBUSTION SECTION AND
POWER TURBINE (AVIM)
3-7
INITIAL SETUP
Crowfoot Attachment, 7/8-Inch
Hoist
Applicable Configurations:
Materials
All
Anti-Seize Compound (E6)
Kit, Lockwire (E32)
Tools:
Powerplant Mechanic's Tools
Personnel Required:
Technical Inspection Tool Kit,
References:
Group Aircraft Cover (T39)
Clamp Coupling Half (T49)
Open-End Wrench (T24)
Power Turbine Fixture (T28)
Torque Wrench, 30-150 Inch-Pounds
GO TO NEXT PAGE