TM 1-2840-252-23-2
3-6
3-6
(AVIM) (Continued)
41. Remove shim (59)from combustor assembly (60)
42. Using outside micrometer, measure thickness of shim
(59) Record dimension If clearance between second
turbine disc assembly and third turbine nozzle (Ref Task
3-5, step 33 )
was not within limits, adjust thickness of
shim (59)
NOTE
Maximum total shim thickness is 0.045 inch.
FOLLOW-ON MAINTENANCE
None
END OF TASK
3-60