TM 5-6115-590-12
SECTION II. MAINTENANCE ALLOCATION CHART
For
Power Plant, Utility (Must)
NSN 6115-00-937-0929
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE CATEGORY
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT
REMARKS
1027
Water Pumps Wire Harness, Interconnecting
Inspect
0.3
Test
0.8
Replace
1.0
Repair
2.0
Rebuild
2.5
11
REFRIGERATION SYSTEM AND
PLUMBING INSTALLATION
1101
Lines and Fittings
Inspect
0.3
Test
2.0
Replace
3.0
Repair
4.0
Overhaul
8.0
14
1102
Pressure Controls
Inspect
0.5
Test
1.0
Replace
2.0
Repair
2.0
14
Overhaul
3.0
Rebuild
5.0
1103
Receivers
Inspect
0.3
Test
2.0
15,16,
Replace
3.0
17,18
Repair
2.0
1105
Coil, Evaporator and Condenser
Inspect
0.1
Test
2.0
Replace
3.0
Repair
2.0
15 t thru 18
12
REFRIGERANT COMPRESSOR
1201
Motor Compressor Assembly
Inspect
0.5
Test
2.0
Service
3.0
Replace
4.0
Repair
4.0
Overhaul
8.0
9,14,
19,
Rebuild
10.0 20,
thru 90
13
SOLENOID VALVES, REFRIG.
1301
Valves, Solenoid
Inspect
0 5
Test
1.0
Replace
1.0
Repair
2.0
14
Overhaul
3.0
Rebuild
4.0
14
WATER SYSTEM AND PLUMBING
INSTALLATION
1401
Lines and Fittings
Inspect
0.3
Replace
2.0
Repair
2.0
1402
Hot Water Tank
Inspect
0.3
Replace
2.5
Repair
3.0
Subcolumns are as follows:
C-Operator/Crew
O-Organizational
F-Direct Support
H-General Support
D-Depot
Change 5 D-10