TM 5-6115-590-12
SECTION II. MAINTENANCE ALLOCATION CHART
For
Power Plant, Utility (Must)
NSN 6115-00-937-0929
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE CATEGORY
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT
REMARKS
1403
Surge Tank
Inspect
0.3
Replace
2.0
Repair
2.0
15
PUMP ASSEMBLY, COLD WATER
1501
Pump Assembly
Inspect
0.5
Test
0.8
Replace
1.0
Repair
2.0
Overhaul
2.5
Rebuild
4.0
16
PUMP ASSEMBLY, HOT WATER
1601
Pump Assembly
Inspect
0.5
Test
0.8
Replace
1.0
Repair
2.0
Overhaul
2.5
Rebuild
4.0
17
BLEED AIR AND EXHAUST HEATING
INSTALLATION
1701
Bleed Air and Exhaust Heating
Inspect
0.8
Replace
2.5
Repair
3.0
Overhaul
3.5
15 thru
18
Rebuild
4.5
32, 33
1702
Valve, Bleed Air Shutoff
Inspect
0.5
Test
1.0
Replace
2.0
Repair
2.5
2, 35
Overhaul
3.0
thru
58
Rebuild
3.5
1703
Valves, Hot Air Shutoff
Inspect
0.5
Test
1.0
Replace
2.0
Repair
2.5
Overhaul
3.0
Rebuild
3.5
1704
Valve. Solenoid, Normally Closed
Inspect
0.5
Test
1.0
Replace
2.0
Repair
2.5
Overhaul
3.0
Rebuild
3.5
18
COMPRESSED AIR AND VACUUM
SYSTEM
1801
Hoe, Lines and Fitting
Inspect
0.5
Service
1.0
Replace
2.0
Repair
4.0
Subcolumns are as follows:
C-Operator/Crew
O-Organizational
F-Direct Support
H-General Support
D-Depot
D-11