TM 5-6115-590-12
SECTION II. MAINTENANCE ALLOCATION CHART
For
Power Plant, Utility (Must)
NSN 6115-00-937-0929
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE CATEGORY
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT
REMARKS
0703
400 HZ Aux.Output No. 1 Wire Harness
Inspect
0.3
Test
0.3
Replace
1.5
Repair
3.0
Overhaul
3.5
0704
400 HZ Aux.Output No. 2 Wire Harness
Inspect
0.3
Test
0.3
Replace
1.5
Repair
3.0
Overhaul
3.5
08
RECEPTACLE PANEL ASSEMBLY
0801
Panel Assembly
Inspect
0.5
Repair
2.0
Overhaul
3.0
Rebuild
4.5
0802
Harness, Electrical
Inspect
0.3
Test
0.8
Replace
1.0
Repair
2.0
Overhaul
3.0
Rebuild
4.5
0803
Water Line Heater Wire Harness
Inspect
0.2
Test
0.4
Replace
0.5
Repair
1.0
Rebuild
2.5
0804
60 Hz Output Wire Harness, Upper
Inspect
0.3
Test
0.5
Replace
1.0
Repair
1.0
Rebuild
2.0
0805
400 HZ Output Wire Harness, Upper
Inspect
0.3
Test
0.5
Replace
1.0
Repair
1.0
Rebuild
2.0
0808
400 HZ Output Wire Harness, Lower
Inspect
0.3
Test
0.5
Replace
1.0
Repair
1.0
Rebuild
2.0
0807
DC Standby Wire Harness
Inspect
0.3
Test
0.5
Replace
1.0
Repair
1.5
Rebuild
2.0
0808
Slave Receptacle Cable Assembly
Inspect
0.3
Test
0.5
Replace
1.0
Repair
1.5
Rebuild
2.0
Subcolumns are as follows:
C-Operator/Crew
O-Organizational
F-Direct Support
H-General Support
D-Depot
D-6