TM 5-6115-590-12
SECTION II. MAINTENANCE ALLOCATION CHART
For
Power Plant, Utility (Must)
NSN 6115-00-937-0929
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE CATEGORY
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT
REMARKS
1921
Cooler and Regulator Assembly. Oil
Inspect
0.4
Replace
1.0
Repair
1.5
Overhaul
3.0
59 thru 73
Rebuild
4.0
1922
Engine Assembly
Inspect
0.5
Test
2.0
Service
2.0
Replace
8.0
Repair
4.0
Overhaul
40.0
Rebuild
40.0 75 thru 98
1923
Pipe Assembly. Exhaust
Inspect
0.5
Replace
4.5
Repair
6.0
99
1924
Plenum. Turbine Exhaust
Inspect
1.0
Replace
8.0
Repair
16.0
Overhaul
20.0
1925
Torus Assembly
Inspect
1.0
Replace
8.0
Repair
16.0
Overhaul
20.0
Rebuild
24.0
1926
Plenum. Air Inlet, Turbine
Inspect
0.5
Replace
8.0
Repair
16.0
Overhaul
20.0
1927
Regulator, Air Pressure
Inspect
0.5
Service
0.5
Adjust
1.0
Replace
1.0
Repair
3.0
Overhaul
3.5
Rebuild
4.0
1928
Wire Harness. Engine
Inspect
0.5
Test
0.5
Replace
2.0
Repair
2.5
1929
Valve, Load Control
Inspect
0.5
Adjust
1.0
Replace
2.0
Repair
10.0 34 thru 37
Overhaul
12.0 50, 51, 103
Rebuild
14 0 thru 110
1930
Fan Assembly. Oil Cooling
Inspect
0.5
Replace
1.5
Overhaul
2.5
111 thru
Rebuild
3.5
114
Subcolumns are as follows:
C-Operator/Crew
O-Organizational
F-Direct Support
H-General Support
D-Depot