TM 55-2840-254-23
9-13.1 REPAIR TORQUEMETER HEAD ASSEMBLY
9-13.1
Materials:
INITIAL SETUP
Insulation Sleeving Flexite (E24)
Applicable Configurations:
All
Personnel Required:
Tools:
Powerplant Mechanic's Tool Kit,
Technical Inspection Tool Kit,
Equipment Condition:
Off Engine Task
Goggles
Hot Air Gun
1.
Repair cracks (1) in sheathing of electrical
cable (2).
a.
Cut a length of 1/2 inch ID insulation
sleeving flexite (E24). Shrink sleeving (3)
shall belong enough to overlap damaged
area by inch minimum.
b.
Slide sleeving (3) over connector (4) and
using a hot air gun, shrink sleeving to fit
over crack (1).
INSPECT
FOLLOW-ON MAINTENANCE:
None
END OF TASK
9-48.2 Change 6