TM 55-2840-254-23
1-112 PREPARE AND INSPECT SHIPPING AND STORAGE CONTAINER (Continued)
1-112
Shipping container is pressurized. Use
care during removal of valve stem. Injury
to personnel can result. Get medical
attention.
3. Remove valve stem (4). Use slotted end of vaIve
cap (3).
Be sure all air pressure has been released
from container before loosening nuts. If
nuts are loosened before pressure is re-
leased, internal pressure could blow
cover off and cause serious injury. If
injury occurs, get medical attention.
4. Remove 30 nuts (5) and bolts (6).
GO TO NEXT PAGE
1-583