1-112 PREPARE AND INSPECT SHIPPING AND STORAGE CONTAINER
Parts:
INITIAL SETUP
Packing
Humidity Indicator Card
Applicable Configurations:
All
Personnel Required:
Tools:
Powerplant Mechanic's Tool Kit,
Equipment Condition:
Technical Inspection Tool Kit,
Engine Removed from Shipping and Storage
Chain with Hooks (Appendix E)
Engine Preserved and Prepared for Shipment
Vacuum Cleaner
Wire Brush
Half-Round File
Hoist
Materials:
Glycerol (E21)
Lint-Free Cloth (E26)
GO TO NEXT PAGE