1-112 PREPARE AND INSPECT SHIPPING AND STORAGE CONTAINER (Continued)
1-112
17. Remove humidity indicator (18) and packing
(19).
18. Remove bushing (20) and humidity indicator
card (21).
19. Install new humidity indicator card (21) and
bushing (20) in housing (22).
20. Install packing (19) and humidity indicator
(18) in base assembly (9).
INSPECT
FOLLOW-ON MAINTENANCE:
Install Engine Into Shipping and Storage
Mark Shipping and Storage Container
END OF TASK
1-588