TM 55-2835-209-23
2-2 INSTALL APU IN SHIPPING CONTAINER (CONT)
1.
2.
3.
4.
5.
6.
7.
Attach lifting sling (1) (T63) to
APU.
Man A hoists APU.
Man B guides APU
in container.
Align mount frame holes for bolts
(2, 3) and trunnions (4).
Install APU with bolts (2, 3) and
trunnions (4).
Torque 1/4 inch bolts to 104 to 116
inch-pounds and 5/16 bolts to 131 to
145 inch-pounds.
Remove lifting sling (1) (T63) from
APU.
Install container cover (5).
2-5