TM 55-2835-209-23
Section II INSTALL APU IN SHIPPING CONTAINER
2-2 INSTALL APU IN SHIPPING CONTAINER
INITIAL SETUP
Tools:
Aircraft Inspection Tool Kit (T49)
Engine Repairmans Tool Kit (T47)
Lifting Sling (T63)
Nitrogen Pressurizing System
Shipping Container
Personnel Required:
68B Aircraft Powerplant Inspector
68B Aircraft Powerplant Repairer
Assistant
Materials/Parts:
Desiccant (D11)
Humidity Indicator (D14)
Nitrogen (D22)
Soap (D34)
General Safety Instructions:
Do not stand under engine
while it is being moved on a
hoist.
To prevent injury to
personnel and damage to equip-
ment during handling of APU,
periodically check lifting
sling.
If there are any signs
of abuse or excessive wear,
notify local safety represen-
tatives.
References:
TB 55-8100-200-24
2-4