TM 55-2835-208-23
2-56 ASSEMBLE FUEL CONTROL
2-56
INITIAL SETUP
Parts:
Applicable Configurations:
Packings
All
Personnel Required:
Tools:
68B Aircraft Powerplant Repairer
68B Powerplant Inspector
Engine Repairmans Tool Kit
NSN 5180-00-323-4944
Torque Wrench
References:
NSN 5120-00-542-4489
TM 55-2835-208-23P
Materials:
Equipment Conditions:
Assembly Fluid No. 1 (E31)
Off APU Task
1.
2.
3.
4.
Using Assembly Fluid No. 1 (E31), lu-
bricate packings (17) and install packings
(17) on bolts (14). Install fuel connec-
tion bolts (14) through fittings (15).
Using Assembly Fluid No. 1 (E31), lu-
bricate packings (16). Install packings
(16) on fuel connection bolts (14) and
install bolts (14) into acceleration control
unit (1). Do not tighten bolts (14) until
fuel control installation (Task 2-57).
Using Assembly Fluid No. 1 (E31), lu-
bricate packing (13). Install packing
(13) on union (12). Install union (12)
and torque to 90-100 inch-pounds.
Using Assembly Fluid No. 1 (E31), lu-
bricate packing (11). Install packing
(11) on union (10). Install union (10)
and torque to 135-150 inch pounds.
GO TO NEXT PAGE
Change 4
2-107