ARMYTM 5-6115-612-34MARINE CORPS TM 6115-34/8AIR FORCETO 35C2-3-471-2NAVYAG-320BO-MME-OOO2-7.ENGINE AND GEARB0X REMOVAL ANDINSTALLATION. (cont)a.Removal. (cont)(21) Rig lifting device in amanner similar to one shown in figure2-3, sheet 3.(14) Tagand disconnect elec-trical connections from starter (8).CAUTION(15) Tag and disconnect elec-trical connections from low oil pres-sure shutdown switch (9).(16) Drain oil from gearbox inaccordancewithparagraph 4-8, TM5-6115-612-12.(17) Remove fuel drain hose fromretaining clamp.(18) Tag anddisconnectoilcooler supply and returnlines (10)from engine.Install protective caps.NOTERemainder of procedure requirestwo personnel.(19) Remove capscrews (11) Fig 2-3and washers (12) that secure engine sup-port assemblies (13) to floor of enginehousing.(20) Make sure all wires, lines,and hoses are clear of engine, gearbox,and generator.WARNINGTheengine,gearbox,andgenerator weigh approximately 165pounds (74.84 kg). To preventinjury, use proper lifting deviceduring removal and installation.To prevent damage, one personmustguideandsteadyenginewhile it is being hoisted out ofengine housing.(22) Firmly steady and guideengine to ensure proper balance andthat engine does nothang up onelectricalwiring,fuellines, oillines, or exhaust nozzle. Slowly hoistengine out of engine housing and clearof generator set.(23) Carefully lower engine tofloor.Ensure that engine support issquarely onfloorbeforefullyreleasing hoist.b.Installation.WARNINGTheengineand gearbox weighapproximately 165 pounds(74.84kg).To preventinjury,useproperliftingdeviceduringremoval and installation.CAUTIONTo prevent damage, one personmust guide andsteadyenginewhile it is being hoisted intoengine housing.NOTEThisprocedurerequirestwopersonnel.2-66
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business