ARMY
TM 5-6115-612-34
MARINE CORPS TM 6115-34/8
AIR FORCE
TO 35C2-3-471-2
NAVY
AG-320B0-MME-000
CHAPTER 11
MAINTENANCE OF LOAD CONNECTION
11-1.
GENERAL.
The
only
load
(4) Insert bare wire into lug and
connection
component
requiring
crimp securely in place.
maintenance at this level is the power
cable.
The power cable serves as the
(5) Install new shrink sleeve.
electrical
connection
between
the
generator set and the aircraft.
Replacing Plug
Connector.
If
the power cable plug connector becomes
damaged and requires replacement, use
11-2.
POWER CABLE.
repair
kit P/N 84-14137.
Complete
instructions and all necessary parts
a.
Removal.
Remove power cable in
for splicing on a new plug connector
accordance
with
paragraph
4-81a,
are contained in the kit.
TM5-6115-612-12.
b. Replacing Terminal Lugs.
d. Installation.
Install
power
cable in accordance
with paragraph
(1) Remove shrink sleeve from
4-81b, TM5-6115-6l2-l2.
damaged lug.
(2) Cut damaged lug from cable.
(3) Strip insulation to bare 3/4
inch (1.9 cm).
11-1(11-2 blank)
