ARMY TM 5-6115-612-12
NAVY AG-320B0-0MM-000
2-4. SLAVE
START
OPERATION.
(cont)
b. Slave Start Procedure. (cont)
(2) Insert jumper cable from vehicle into
slave receptacle of generator set.
(3) Start generator set in accordance with
paragraph 2-3.
(4) When generator set is started, remove
jumper cable. Install dust cap on slave receptacle.
MASTER SWITCH to OFF position. Close and secure
control panel access door.
NOTE
When generator set is shut down, the fuel
shutoff solenoid valve will discharge a small
amount of fuel out the bottom of the cart
beneath the fuel housing.
b. Disconnect
Power
Cable.
2-5. REMOVING GENERATOR SET FROM
Disconnect power cable and stow on cable support at
OPERATION.
rear of generator set.
Stop
Generator
Set
Engine.
Perform
After Operation
PMCS.
Place CONTACTOR switch in OPEN position.
Refer to Table 3-2 and perform after operation (A)
Allow engine to run a minimum of one minute, Move
PMCS. Ensure that fuel and oil levels are at full.
Section II. OPERATION UNDER UNUSUAL CONDITIONS
2-6. GENERAL. The generator set is designed to
operate in ambient temperatures of -65°F (-53.9°C)
to 125°F (51.70°C). This section provides information
for operating the set in extreme environmental condi-
tions.
2-7. OPERATION IN
EXTREME
HEAT.
Procedures for operation of the generator set in
extreme heat (ambient temperatures up to 125°F
(51.7°C) are identical to normal operating proce-
dures. Allow engine to run a minimum of 10 minutes
prior to moving the CONTACTOR switch to the
CLOSED position.
2-8. OPERATION IN
EXTREME
COLD.
Procedures for operation of the generator set in
extreme cold (defined as ambient temperatures below
-25°F (-32°C)) are identical to normal operating pro-
cedures. During operation in extreme cold, keep fuel
tank full to reduce condensation, The primary fuel
filter should be drained of condensation before and
after operation.
a. Open Fuel Housing.
(1) Set handbrake.
(2) Open control panel access door. Ensure
MASTER SWITCH is in OFF position. Close control
panel access door.
(3) Remove power cable (1, figure 2-6)
from cable support assembly (2).
(4) Unlatch and open fuel housing access
door (3).
b. Drain Primary Filter.
(1) Place clear container (4) under fuel drain
valve (5) of primary fuel filter (6).
2-10
Change 2
