4-33.
CURRENT SHUNT (20 AMP). (cont)
b. Removal. (cont)
(4) From terminal D. remove screw
(5),
lockwasher (6), washer (7),
terminal lug (8) of wire U112A18.
(5) From terminal A, remove
(9), lockwasher (10), terminal luq
and
nut
(11)
of wire P103E14, nut (12), and washer
(13) from terminal post.
(6) From terminal B, remove nut
(14),
lockwasher (15), terminal
lug
(16) of wire P103B14, nut (17), and
washer (18) from terminal post.
(7) Remove
self-locking
nuts
(19),
washers (20), and screws (21)
that secure current shunt (22) to
bulkhead.
c.
Installation.
(1) Secure current shunt (22) to
bulkhead of inlet air housing with
screws
(21),
washers
(20),
and
self-locking
nuts (19).
Torque to
36-40 inch pounds (4-4.5 Nm).
ARMY
TM 5-6115-612-12
MARINE CORPS TM 6115-12/7
AIR FORCE
T0 35C2-3-471-1
NAVY
AG-320B0-0MM-000
(2) At terminal B, install washer
(18), nut (17),
and terminal lug (16)
of wire P103B14. Secure with lockwasher
(15) and nut (14).
(3) At terminal A, install washer
(13), nut (12), and terminal lug (11)
of
wire
P103E14.
Secure
with
lockwasher (10) and nut (9).
(4) At terminal D, install termi-
nal lug (8) of wire U112A18 and washer
(7).
Secure with lockwasher (6) and
screw (5).
(5) At terminal C, install termi-
nal lug (4) of wire U111A18 and washer
(3).
Secure with lockwasher (2) and
screw (1).
(6) Close
inlet air housing
(7) Connect
connector.
and
securely
latch
access door.
battery cable plug
(8) Stow power cable on cable
support assembly.
4-83