TM 1-2840-252-23-3
8-22
INSTALL FLO W PROGRAMMING VALVE (Continued)
8-22
NOTE
If flow programming valve is a replacement, do steps 1. thru 5.. If same flow
programming valve that was removed is to be installed, omit steps 1. thru 5..
1. Remove two unions (1) and packings (2) from removed flow programming valve (3).
2. Remove tee (4), nut (5), and packing (6) from removed flow programming valve (3).
3. Install nut (5) on tee (4). Install packing (6) on tee (4). Position nut to. make sure packing is in groove
between two sets of thr ads on tee.
e
4. Install tee (4) on serviceable flow programming valve (3).
5. Install two packings (2) and unions (1) on serviceable flow programming valve (3).
NOTE
If oil cooler assembly is not installed, do step 6.. If oil cooler assembly is installed,
omit step 6..
6. Install flow programming valve (3), bracket (7) , bracket (8), three bolts (9), three washers (10), and
three nuts (11).
GO TO NEXT PAGE
8-59