TM 5-6115-590-12
SECTION II. MAINTENANCE ALLOCATION CHART
For
Power Plant, Utility (Must)
NSN 6115-00-937-0929
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE CATEGORY
TOOLS
GROUP
COMPONENT/ASSEMBLY
MAINTENANCE
AND
NUMBER
FUNCTION
C
O
F
H
D
EQPT
REMARKS
19
ENGINE AND SKID ASSEMBLY
1901
Assembly
Inspect
0 5
Service
1.5
Replace
4.0
Repair
10.0
Overhaul
25.0
1902
Pump, Fuel Boost
Inspect
0.3
Test
0.5
Service
0.5
Replace
1.5
Repair
2.5
Overhaul
3.0
Rebuild
3.5
1903
Tank Assembly, Fuel Float and Vent
Inspect
0.3
Valve
Test
0.5
Replace
1.0
Repair
1.0
1904
Tank, Oil
Inspect
0.3
Service
0.1
Replace
1.0
Repair
1.0
1905
Tank, Fuel
Inspect
0.3
Service
0.6
Replace
1.5
Repair
2.5
1906
Chassis Assembly, Upper Electrical
Inspect
0.5
Power
Test
1.0
Replace
3.0
Repair
4.0
1907
Harness, Electrical
Inspect
0.3
Test
0.8
Replace
2.0
Repair
2.5
Rebuild
4.0
1908
Battery Charger Assembly
Inspect
0.3
Test
0.5
Adjust
0.5
Replace
0.8
Repair
3.0
Overhaul
3.5
Rebuild
4.0
1909
Printed Circuit Board
Inspect
0.3
Test
0.5
Replace
0.5
Repair
1.5
Rebuild
2.5
1910
Voltage Regulator Assy. 60 HZ
Inspect
0.3
Test
0.5
Replace
0.8
Overhaul
3.5
Subcolumns are as follows:
C-Operator/Crew
O-Organizational
F-Direct Support
H-General Support
D-Depot
D-12
