TM 55-2840-254-23
9-4 REPAIR TORQUEMETER JUNCTION BOX
9-4
INITIAL SETUP
Materials:
Crocus Cloth (E15)
Applicable Configurations:
Personnel Required:
All
Tools:
Powerplant Mechnaic's Tool Kit,
Equipment Condition:
Technical Inspection Tool Kit,
Off Engine Task
Goggles
Compressed Air Source
NOTE
This repair is allowed provided it does
not cause pins to break or crack.
1.
Straighten bent pins (1 and 2) of electrical
connectors (3 and 4). Using long-nose pliers,
gently move pins (1 and 2) until they are straight.
GO TO NEXT PAGE
Change 6 9-11