8-55
8-55 INSTALL HOSE ASSEMBLY (MAIN OIL PUMP TO
NO. 4
AND 5
BEARING
SCAVENGE TUBE ASSEMBLY)
INITIAL SETUP
Materials:
Lockwire (E29)
Applicable Configurations:
All
Parts:
Packing
Tools:
Powerplant Mechanic's Tool Kit,
Personnel Required:
Technical Inspection Tool Kit,
1/4-Inch Universal Joint Stocket,
References:
TM 55-2840-254-23P
12 Point, 1/4-inch Drive,
NSN 5120-00-018-1553
GO TO NEXT PAGE