TM 55-2840-254-23
1-107
1-107 TEST ENGINE (AVIM) (Continued)
a. Ensure N1 control is at flight idle, and slowly advance N1 master hydronic control until bleed
band closes. Full closure shall be within limits given below.
Bleed Band Closure Limits Versus Ambient Temperature
GO TO NEXT PAGE
1-471