TM 55-2840-254-23
1-107 TEST ENGINE (AVIM) (Continued)
1-107
j. Advance water in master hydronic control until 30 percent N2 speed has been obtained. Calculate
power and fuel rate using table below.
NOTE
Obtain compensated SHP and compensated Wf from METS torquemeter
and fuel flow indicators.
Actual SHP = Compensated SHP x
Actual Wf = Compensated Wf x
Corrected
Compensating
Compensating
Corrected
Factor
Factor
Barometer
Barometer
28.50
29.90
0.9993
0.9525
29.92
1.000
28.60
0.9559
30.00
1.003
28.70
0.9592
1.006
28.80
0.9626
30.10
28.90
0.9659
30.20
1.009
29.00
0.9693
30.30
1.013
1.016
29.10
0.9726
30.40
29.20
0.9759
30.50
1.019
29.30
1.023
0.9793
30.60
29.40
30.70
1.026
0.9826
29.50
0.9860
30.80
1.029
29.60
0.9893
30.90
1.033
29.70
0.9926
31.00
1.036
29.80
0.9960
GO TO NEXT PAGE
1-466