1-93
1-93 INSPECT ENGINE HOT END (AVIM) (Continued)
b. Inspect 61 vanes (134) as follows:
(1) There shall be no nicks (135) in leading
edge (133) deeper than 1/16-inch.
(2) There shall be no material burned off.
(3) There shall be no converging cracks (136).
There shall be no cracks (137) wider than
(4)
1/32-inch.
(5) There shall be no cracks in any area
where vane has been bent.
c. Inspect inner shroud (138). There shall be no
more than one crack (139) from each vane
leading edge (133) to braze line (140).
GO TO NEXT PAGE
1-350