TM 55-2835-209-23
1-20 REMOVE APU FROM SHIPPING CONTAINER (CONT)
3. Inspect lifting lug (6) for security
or cracks.
No cracks allowed.
4.
Attach lifting sling (7) (T63).
5.
Remove bolts (8, 9) and trunnion
(10).
6.
With helper guiding APU lift APU out
of container.
7.
Inspect front mounting lug pads on
APU for cracks.
No cracks allowed.
8.
Install front and rear mounting lugs
from replaced APU or. stock. Torque
front mounting lugs to 104 to 116
inch-pounds.
Rear mounting lug will
be hand tight.
FOLLOW-ON MAINTENANCE: None.
Change 1
1-13