Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
INSTALL PRIMARY AND SECONDARY FUEL NOZZLE ASSEMBLIES (AVIM) (CONT) - TM-55-2835-209-23_151
REPLACE FUEL CHECK VALVE
TM-55-2835-209-23 Gas Turbine Engine (Auxiliary Power Unit APU) Model T 62T 40 I Part Numbers 116305-100 and 116305-200 Manual
Page Navigation
126
127
128
129
130
131
132
133
134
135
136
TM 55-2835-209-23
4-20 INSTALL PRIMARY AND SECONDARY FUEL NOZZLE ASSEMBLIES (AVIM) (CONT)
10. Install nozzle seal plates (2) on secondary
fuel nozzle assemblies (8).
11. Install secondary fuel nozzle assembly (8) at
6 o’clock position. Secure with washers (4)
and bolts (5).
12. Install secondary fuel nozzle assemblies (8)
at 2 and 10 o’clock positions. Secure with
washers (4), bolts (5) and studs (6).
13.
Torque
all bolts and studs to 47 to 53 inch-
pounds.
14. Lockwire bolts (5) and studs (6) with
lockire (D44).
15. Install brackets (9) at 2, 10 and 12 o’clock
positions and secure with nuts (10). Torque
nuts to 33 to 37 inch-pounds.
16. Connect fuel manifold assembly (7) to all
primary and secondary fuel nozzles.
17.
Torque
fuel manifold assembly (7) to 33 to
37 inch-pounds.
FOLLOW-ON MAINTENANCE: None.
4-56
Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business