TM 55-2835-208-23
2-30 INSTALL PURGE VALVE ASSEMBLY
2-30
INITIAL SETUP
Applicable Configuration:
APU 116305-100
Materials:
Lockwire (E16)
Tools:
Engine Repairmans Tool Kit
NSN 5180-00-323-4944
Torque Wrench
NSN 5120-00-542-4489
Personnel Required:
68B Aircraft Powerplant Repairer
68B Powerplant Inspector
Equipment Condition:
APU in Assembly Fixture (Task 1-22)
pounds.
2.
1.
3.
FOL
Install purge valve assembly (3) into com-
pressor fitting (4). Torque to 135 inch-
Connect start fuel tubes (1) and (2).
Torque B-nuts (5) to 80 inch-pounds).
Safety wire fitting assembly nut (4) (-100
APU only) with lockwire (E16).
LOW-ON MAINTENANCE:
None
END OF TASK
2-60
Change 4