GENERATOR SET TEST AND INSPECTION AFTER REPAIR AND OVERHAUL
Section I.
GENERAL REQUIREMENTS
13-1.
GENERAL.
The
activity
per-
NOTE
forming repair and overhaul is re-
sponsible for the Performance of all
In addition to following standard
applicable
tests and
inspections
shop
procedures
and
safety
specified
herein.
Activities
per-
precautions,
personnel performing
forming maintenance on any portion of
maintenance on the generator set
the generator set must perform those
shall
become
familiar
with
tests and inspectIons required by the
specific
warnings
and cautions
applicable component or system repair
appearing in this manual and in
instruction.
TM 5-6115-612-12.
Section II. INSPECTION
13-2. GENERAL.
A
thorough
in-
13-4.
ENGINE INSPECTION.
spection shall be conducted each time
the generator set is overhauled or
a. Inspect
engine
mount
for
rebuilt to ensure that workmanship and
proper attachment to frame.
materials are satisfactory. For speci-
fic inspection and Installation pro-
b.
Inspect
fuel
system
cedures, refer to the appropriate chap-
components
for proper
electrical
ter and paragraph in TM 5-6115-612-12
connections.
Ensure
that
loop
or TM 5-6115-612-34.
clamps
are installed to prevent
chafing of wires.
13-3.
FRAME AND HOUSING INSPECTION.
Inspect
the frame and
housing as
c.
Inspect
fuel
system
follows:
components for proper installation
of fuel lines.
Ensure that loop
Inspect
exterior
for
proper
clamps
are installed to prevent
finish.
chafing of fuel lines.
b. Inspect tiedown rings for proper
d. Inspect
spark
igniter,
Installation.
exhaust
gas
temperature
thermocouple,
monopole speed sensor,
Inspect access covers and access
ignition coil ,
and
starter
for
doors for proper operation.
Ensure
proper installation.
that all latches and fasteners are
properly installed.
Inspect oil lines, fittings,
drain valves,
and plugs for proper
d.
Inspect
battery
and
battery
Installation.
Ensure
that
loop
holddown
for
proper
installation.
clamps
are Installed to prevent
Ensure that all cables and cable con-
chafing of oil lines.
nections are secure.
f. Inspect oil cooler for proper
e.
Inspect welded joints for cracks.
installation.