ARMY
TM 5-6115-612-12
MARINE CORPS TM 6115-12/7
AIR FORCE
TO 35C2-3-471-1
NAVY
AG-320B0-0MM-000
4-10. GENERAL. (cont)
Table 4-3.
Organizational Troubleshooting - Continued
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
Step 3.
While starting generator set,
check voltage on high pressure
fuel pump connector J14-A(+) and J14-B(-).
If voltage is 16-24 Vdc, go to Step 4.
If voltage
less than 16 Vdc,
check battery voltage.
Replace or recharge battery (paragraph 4-27).
If battery
good, replace EECM (paragraph 4-64).
Step 4.
Check for 24 Vdc on transfer pump connector P17-A(+) and
P17-B(-).
If 16-24Vdc present, go to Step 6.
If no voltage,
disconnect battery cable plug connector.
Visually inspect for damage and check continuity on wires
U117A16 (TB3-19 to P17-A) and V102AF16 (TB3-1 to P17-B).
Replace if damaged, shorted, or no continuity.
Step 5.
Check fuel flow of transfer pump (paragraph 4-37).
If fuel flow is correct, go to Step 6.
If fuel flow is low, service transfer pump (paragraph 4-37)
and connecting fuel lines.
Replace pump if necessary.
Step 6.
Disconnect outlet fuel line from solenoid valve.
Direct fuel
outlet line into a suitable container.
Start generator set and
check fuel flow.
If fuel flow good, refer to next higher maintenance level.
If fuel flow appears low,
ensure that solenoid valve fuel
lines are not restricted.
If no restrictions, replace
solenoid valve (paragraph 4-42).
11.
GENERATOR SET SHUTS DOWN WITH LOW OIL PRESS MALFUNCTION LIGHT AFTER READY TO
LOAD BUT STILL IN NO LOAD.
Step 1.
Inspect generator set lubrication system for leaks and damaged
hoses (Section XII).
Tighten loose fittings and replace damaged hoses.
4-34