TM 5-6115-590-12
Figure 2-19(1). Operation to Deliver Hot and Cold Water. (Sheet 1 of 2). (TS 6115-590-12/2-191)
various fuel and moisture drains in the bottom of
the enclosure.
b. The power plant should be inspected frequently
to insure that mud has not plugged any drains,
fittings, or other openings.
c. Boards or other suitable support material should
be placed around the power plant to provide solid
dry surfaces for personnel operating and servicing
the power plant.
2-22. Operation at High Altitudes
The power plant will operate satisfactorily at
altitudes up to 10,000 feet except that cooling
capacity will be reduced with altitude.
2-23. Operation Below Sea Level
The power plant will operate satisfactorily
below sea level.
2-28