TM 5-6115-590-12Figure 2-14. Operation to Deliver 400 Hz Electrical Power. (TS 6115-590-12/2-14)(4) After power plant has cooled, carefullyunroll tarpaulin cover and cover the power plant.Secure all tiedown straps.2-12. Operation of Equipmenta. Operation to Deliver 60 Hz Electrical Power.Refer to fig. 2-13 for operation of the 60 Hzelectrical system.b. Operation to Deliver 400 Hz Electrical Power.Refer to fig. 2-14 for operation of the 400 Hzelectrical system.c. Operation to Deliver Cooled Air. Refer to fig.2-15 for operation of the cooled air system.NOTEMake up air doors (fig. 2-10) should be opened asrequired during operation of the cooled air systemto permit intake of make up air to the systemCAUTIONCondenser air inlet panels and condenser airoutlet doors (fig. 2-10) must be open beforeoperating the cooled air system.2-18