TM 1-2840-252-23-2
6-43
INITIAL SETUP
Materials:
None
Applicable Configurations
All
Personnel Required
Tools
Technical Inspection Tool Kit,
Equipment Condition
Off Engine Task
1. Inspect pressurizing valve (1)
a. There shall be no nicks, scratches, and
gouges on sealing surface
b. There shall be no damaged threads on inside
of nut (2)
c. Fittings (3, 4 and 5) shall not be loose If fit-
tings are loose tighten fittings
FOLLOW-ON MAINTENANCE
None
END OF TASK