TM 1-2840-252-23-2
5-12
INSTALL PT SPEED PICKUP (Continued)
5-12
1. Install packing (1) on power turbine speed
pickup (2) and insert into drive assembly (3)
Install two bolts (4) and lockwire Use lockwire
(E33)
NOTE
The second power turbine speed pickup is
identical
2. Connect electrical connector5) to power tur-
(
bine speed pickup (2)
3. Connect electrical connector6) to power tur-
(
bine speed pickup (2)
INSPECT
FOLLOW-ON MAINTENANCE
None
END OF TASK
5-47/(5-48 blank)