TM 1-2840-252-23-2
4-50
INSTALL FOURTH STAGE POWER TURBINE NOZZLE (AVIM) (Continued)
4-50
Install oil tube fixture (T45)(5), two 1/4 x 28 bolts
6.
(6), and 1/4 x 28 nuts (7) on nozzle flange (8) at the
12-o'clock position
Thread reducer (9) into lube-in adapter (10until
)
7.
adapter (10) is firmly seated in oil tube fixture (T45)
(5)
GO TO NEXT PAGE
4-261