TM 1-2840-252-23-2
4-50 INSTALL FOURTH STAGE POWER TURBINE NOZZLE (AVIM) (Continued)
4-50
1. Install No. 4 and 5 bearing oil tubesRef Task 4-45)
(
2. Align bolt hole (1) with bolt hole (2)
3. Apply anti-seize compound (E6) to 19 bolts (3)
4. Install No. 4 and 5 bearing package (4and 19 bolts
)
(3)
5. Lockwire bolts (3). Use lockwire (E33)
GO TO NEXT PAGE
4-260